Service 07

Temporary Heating

Temporary heating for industrial facilities, commercial construction and warehouses, from 10,000 to 20,000 square foot projects to facilities exceeding 400,000 square feet.

A cold building can put an entire project behind schedule. Green Peak can help plan and coordinate temporary heating for industrial and commercial projects, from smaller 10,000 to 20,000 square foot projects to facilities exceeding 400,000 square feet. Many industrial clients need to maintain temperatures above 60°F. Whether your project requires 40°F, 60°F or another specified temperature, we can plan and size a temporary heating system around your facility, actual heat loss, site conditions and schedule.

Illustrative equipment and site imagery.

What this covers

  • Temporary heat for smaller projects and 400,000+ sq ft industrial facilities
  • Indirect-fired heater and distribution planning
  • Coordination of heat sources, qualified operators, power and fuel supply
  • Temperature control for coating, insulation and construction work to project specifications
  • Temporary warming for warehouses, manufacturing and commercial construction
  • Phased heating and work-zone coordination, subject to site and equipment availability
  • Ground thawing and frost protection coordination for construction work

Temporary heat for large industrial buildings

Building size is only a starting point. Green Peak can scope heating for projects from 10,000 to 20,000 square feet to industrial facilities exceeding 400,000 square feet. A 300,000 to 400,000 square foot example facility with a 30-foot clear height contains 9 to 12 million cubic feet of air. Outdoor conditions, roof and wall insulation, open loading doors, mechanical exhaust, temporary enclosure and the target indoor temperature all change the required heat output. A workable plan also accounts for distribution and the available power and fuel supply.

What does that mean in BTU per hour?

For planning only, assume 30-foot ceilings, a 40°F indoor-to-outdoor temperature difference, 0.5 to 1 combined outdoor air changes per hour and a hypothetical envelope heat loss of 1.2 to 2.0 million BTU/hr. Approximate air-exchange heat loss would be 3.2 to 8.6 million BTU/hr. Adding envelope losses gives about 4.4 to 10.6 million BTU/hr of delivered heat. This is an illustrative range, not a quoted load or a sizing guarantee. Actual door openings, ventilation, ground losses and the building envelope may change it substantially.

High-capacity indirect-fired equipment

Large indirect-fired equipment separates combustion exhaust from the heated supply air through a heat exchanger. Manufacturer ratings vary: Eco Power lists the IAQH-2000 at 2 million BTU/hr nominal input and 1.6 million BTU/hr heat output, and its rated airflow is 32,000 CFM. Aggreko lists indirect-fired rental equipment up to 1.5 million BTU/hr, while Generac's MIH4.2ES published manual documents a maximum rated output of approximately 4.2 million BTU/hr. These are market equipment examples, not a statement of Green Peak fleet ownership. Multiple heaters and zones may be required. Heater input and delivered output are not interchangeable. Final unit selection, availability, ducting, ventilation, locations, power, fuel and monitoring are reviewed with qualified equipment providers and site safety personnel.

How we scope a winter project

Tell us your floor area, clear height, insulation and enclosure status, location, target temperature, work schedule, exhaust and door-opening patterns, and available utility connections. We can coordinate a project-specific heating plan and equipment arrangements. Combustion equipment requires appropriate clearances, ventilation, qualified setup, and carbon monoxide risk controls. Follow the manufacturer instructions, applicable codes and site rules. We do not guarantee a temperature without site conditions and a confirmed scope.

Ground thawing and frost protection

Temporary heat is also useful for frozen ground and concrete work. We can discuss ground thawing and frost protection as part of the project plan, based on soil conditions, frost depth, work area, site access and schedule. Equipment choice and monitoring depend on the actual job and qualified provider recommendations.

Project starter

Scope a temporary heating project.

Send us the facility, the surface, and the problem. We will come back with a scope built around how the work actually has to run.