Green Peak restored the historic multi-ton steel entrance gates at Green Lake Conference Center, coordinating removal, transport, metal fabrication, abrasive blasting, high-build protective coating and reinstallation.

Request a Quote (RFQ)
Services

Advanced Metal Fabrication, Abrasive Blasting, Protective Coatings, Industrial Site Support

Environment

Historic commercial and institutional facility

Location

Green Lake, Wisconsin

Year

2018

Restoring these historic entrance gates meant far more than repainting them. Green Peak coordinated the complete restoration, from mobilization, rigging and transport to steel fabrication, surface preparation, protective coating and reinstallation. Some sections of the bent and damaged gates contained solid steel up to 2.5 inches thick, and assemblies weighed multiple tons.

Our team removed and transported the gates to our shop, where we carried out extensive metal fabrication to rebuild damaged portions and restore the original forms and ornamental details. Wet and dry abrasive blasting removed deteriorated finishes and prepared the steel for the specified protective system. The actual work photographs document our shop, site equipment, compressors, transport trucks and handling equipment throughout the restoration.

Instead of a conventional paint finish, Green Peak applied 80 to 100 mils of black-pigmented Dura-Clear from Oak Ridge Foam & Coating Systems, an aliphatic polyaspartic polyurea coating as identified in the project records. The aliphatic chemistry was selected for exterior color stability, and the longer working time of the polyaspartic system supported a smooth, glossy black finish across the detailed metalwork. The stated thickness is specific to this project, not a general manufacturer recommendation.

The completed assemblies were transported back to the grounds and reinstalled. This project brings together the disciplines that make demanding restoration possible: custom metal fabrication, asset handling, abrasive blasting, protective coatings, logistics and on-site coordination.

Specified protective coating

Dura-Clear | Oak Ridge Foam & Coating Systems

For this project, Green Peak applied a black-pigmented aliphatic polyaspartic polyurea system at 80 to 100 mils. Aliphatic coating chemistry is used for color retention in direct sunlight. The system's longer working time allowed the coating to flow out to the smooth, high-gloss finish seen in the project photos.

Product name, coating type and installed thickness are based on the historical project account. The original Dura-Clear technical and safety data sheets were not available in the manufacturer's current public catalog.

Oak Ridge protective coating information

A historic Wisconsin estate

Preserving the entrance to Green Lake Conference Center

In 1888, Chicago newspaper publisher Victor Lawson and his wife Jessie began acquiring land on Green Lake that became Lone Tree Farm. Jessie oversaw much of the estate's development, including roads, gardens, bridges and buildings.

After the Lawsons, the H.O. Stone Development Company transformed the property into Lawsonia, an ambitious resort and golf community. During the Depression, rumors circulated that Al Capone was interested in purchasing it. Those rumors are not documented ownership, and a contemporary foreclosure judge disputed the story.

In December 1943, the American Baptist Assembly acquired the estate with support from Dr. Luther Wesley Smith and James L. Kraft. Its first conference season began in 1944. The grounds later hosted Dr. Martin Luther King Jr. in 1956 and 1957 and continue to serve as a Christian conference and retreat center.

Project photography

54 actual field photos. Select a photograph to view it in full.

Historic Gate Restoration | Green Lake Conference Center: Restored gates at Green Lake Conference Center 1Historic Gate Restoration | Green Lake Conference Center: Restored gates at Green Lake Conference Center 2Historic Gate Restoration | Green Lake Conference Center: Restored gates at Green Lake Conference Center 3Historic Gate Restoration | Green Lake Conference Center: Restored gates at Green Lake Conference Center 4Historic Gate Restoration | Green Lake Conference Center: Restored gates at Green Lake Conference Center 5Historic Gate Restoration | Green Lake Conference Center: Restored gates at Green Lake Conference Center 6Historic Gate Restoration | Green Lake Conference Center: Restored gates at Green Lake Conference Center 7

Before / after

◀▶
Before: surface preparationAfter: coating system

Project starter

Start your project with a conversation.

Tell us about your advanced metal fabrication needs, and we will develop a scope for your facility.