Nitric Acid Trench Restoration

Restoration of a deteriorated industrial nitric acid containment trench with a seamless spray-applied polyurea liner and chemical-resistant epoxy finish.

Request a Quote (RFQ)
Services

Tank & Trench Liners, Abrasive Blasting, Protective Coatings, Containment

Environment

Manufacturing

Location

Pleasant Prairie, Wisconsin

Year

2026

During this project in Pleasant Prairie, Wisconsin, Green Peak restored an existing industrial containment trench that had deteriorated under chemical exposure. The existing coating and concrete showed visible wear and deterioration, and the trench connected with adjacent process and traffic areas. Instead of replacing the entire structure, the project focused on rehabilitating the existing substrate and providing a continuous protective lining.

The crew performed wet abrasive blasting and mechanical surface preparation, removing deteriorated coating and profiling the concrete. Localized epoxy patching and leveling addressed damaged surfaces and transitions. The specified system included Corobond 100 penetrating epoxy primer to prepare the substrate for the lining.

The high-build lining consisted of XP-421 pure polyurea from Ultimate Linings, installed at 125+ mils, followed by an 7-9 mil DFT Epo-Phen chemical-resistant epoxy finish. The lining extended through the trench walls, bottom and adjoining specified transition areas to form an integrated protective system. Terminations were considered as part of the system rather than as an afterthought.

The finished photographs show the restored gray lining and the transitions from the trench to the adjacent concrete. The 3D rendering illustrates the system concept, while the field photographs and video document the actual work from the initial condition to completion. Chemical compatibility and service conditions must be assessed for each individual project.

Project video

Protective lining system

Original annotated 3D concept from the project proposal. The callouts show each layer and the initial design specifications. The completed application details are listed above.

3D concept of the trench cross section showing the existing concrete, prepared substrate, primer, polyurea liner and finishView full-size annotated rendering
  1. 1Existing concrete and failed lining
  2. 2Abrasive preparation and local substrate repair
  3. 3Corobond 100 penetrating epoxy primer
  4. 4125+ mil XP-421 pure polyurea
  5. 57-9 mils DFT Epo-Phen FF epoxy finish

Project photography

47 actual field photos. Select a photograph to view it in full.

Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 1Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 2Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 3Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 4Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 5Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 6Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 7Nitric Acid Trench Restoration: Original trench and adjacent concrete before restoration 8Nitric Acid Trench Restoration: Prepared trench, repairs, masking and containment 9Nitric Acid Trench Restoration: Prepared trench, repairs, masking and containment 10Nitric Acid Trench Restoration: Prepared trench, repairs, masking and containment 11Nitric Acid Trench Restoration: Prepared trench, repairs, masking and containment 12